توسعة شبكة توزيع الغاز في ممر المنافع للمنطقة الصناعية الحالية - المرحلة الأولى
One of 10,000+ projects Taiyo tracks in Saudi Arabia.
Source: Ministry of Finance, Saudi Arabia
Includes procurement, construction, testing and commissioning all works necessary for the expansion of existing sales gas network from LIPE-I up to C2 area. The approximate length of expansion is 3.5 km. However, final length will be determined later as per potential customer's locations. Currently, forecasted demand of potential consumers of sales gas in C2 area is 30 MMSCFD. However, the desig
- Status
- Prospective
- Sector
- Government
- Location
- Saudi Arabia
- Updated
- 19 Nov 2026
- Source
- Ministry of Finance, Saudi Arabia
ConstructChat
Ask ConstructChat about توسعة شبكة توزيع الغاز في ممر المنافع للمنطقة الصناعية الحالية - المرحلة الأولى
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | معتمد |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Includes procurement, construction, testing and commissioning all works necessary for the expansion of existing sales gas network from LIPE-I up to C2 area. The approximate length of expansion is 3.5 km. However, final length will be determined later as per potential customer's locations. Currently, forecasted demand of potential consumers of sales gas in C2 area is 30 MMSCFD. However, the design should include sufficient capacity for expansion for other consumers within the C2 area. |
Location
Country | Saudi Arabia |
Source
Source | Ministry of Finance, Saudi Arabia |
URL |
More Details
Record type | Project |
Sector | Government |
Article published date | 2025-12-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in Saudi Arabia
- Saudi Guardian International Float Glass Co. Ltd.
- Saudi Vaccine and Biomanufacturing Centre
- Yanbu Phase 3 Seawater Desalination Plant
- Yanbu III Power Plant
- Fadhili Gas Plant, Jubail
- SAJAPHCO JV’s Pharmaceuticals Formulation Plant, Saudi Arabia
- Wadi Laban Suspension Bridge Two Parallel Bridges Project
- Oxagon x McLaren Accelerator
