logo

تطوير البنية التحتية والطرق والمرافق العامة لمنطقة الصناعات الخفيفة - المرحلة الأولى

Sector: Manufacturing (Industrial) • Location: Saudi Arabia

Source: Ministry of Finance, Saudi Arabia

Project
معتمد

This is a procurement and construction (PC) contract that includes the Utilities connections to suit proposed expansion requirements in 2.4 Km2 area. The project includes the Procurement and Construction of Utility connections to various Royal Commission-designated industrial sites located within JCPDI. This scope will also include Utilities connections to suit proposed expansion requiremen

Status
Prospective
Sector
Manufacturing (Industrial), Power Transmission, Power Generation (CCGT), Government
Location
Saudi Arabia
Updated
22 Jul 2026
Source
Ministry of Finance, Saudi Arabia

ConstructChat

Ask ConstructChat about تطوير البنية التحتية والطرق والمرافق العامة لمنطقة الصناعات الخفيفة - المرحلة الأولى

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “تطوير البنية التحتية والطرق والمرافق العامة لمنطقة الصناعات الخفيفة - المرحلة الأولى” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Saudi Arabia. Taiyo aggregates data on it from Ministry of Finance, Saudi Arabia.

Participants

Sponsoring Agency

Status

Original status

معتمد

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This is a procurement and construction (PC) contract that includes the Utilities connections to suit proposed expansion requirements in 2.4 Km2 area. The project includes the Procurement and Construction of Utility connections to various Royal Commission-designated industrial sites located within JCPDI. This scope will also include Utilities connections to suit proposed expansion requirements. This includes, but not limited to, studying existing site conditions, perform field surveys

Location

Country

Saudi Arabia

Source

Source

Ministry of Finance, Saudi Arabia

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Power Transmission, Power Generation (CCGT), Government

Article published date

2025-12-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project