تصميم و إنشاء نظام التبريد بمياة البحر - المرحلة الأولى
معتمد · Saudi Arabia
Source: Ministry of Finance, Saudi Arabia
Phase 1 will be EPC contract for design and construction and precurment including the water intake, offshore intake pipework, intake basin, distribution pumps, distribution network (approx. 4 km), outfalls basin and offshore outfall pipework. this project to serve existing investors such as Pan Asia, Solb Steel and Al-Reef early cooling demand of approx. 180,000 m3/h.
- Status
- Prospective
- Sector
- Water Supply and Storage, Steel, Metal, Government
- Location
- Saudi Arabia
- Updated
- 19 Nov 2026
- Source
- Ministry of Finance, Saudi Arabia
ConstructChat
Ask ConstructChat about تصميم و إنشاء نظام التبريد بمياة البحر - المرحلة الأولى
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | معتمد |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Phase 1 will be EPC contract for design and construction and precurment including the water intake, offshore intake pipework, intake basin, distribution pumps, distribution network (approx. 4 km), outfalls basin and offshore outfall pipework. this project to serve existing investors such as Pan Asia, Solb Steel and Al-Reef early cooling demand of approx. 180,000 m3/h. |
Location
Country | Saudi Arabia |
Source
Source | Ministry of Finance, Saudi Arabia |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Metal, Government |
Article published date | 2025-12-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
