إنشاء التجهيزات الأساسية والطريق رقم 12 بين الطرق 1 و 9
معتمد · Saudi Arabia
Source: Ministry of Finance, Saudi Arabia
The work of this contract includes the engineering, procurement and construction (EPC) for the section of road no.12 which lies between road no. 1 and road no. 9. Total length of road is approximately 7.8 kilometers. The right of way for this road is 80 m, 3 lanes per each direction. The project is located in the industrial area of JCPDI.
- Status
- Prospective
- Sector
- Road, Manufacturing (Industrial), Government
- Location
- Saudi Arabia
- Updated
- 19 Nov 2026
- Source
- Ministry of Finance, Saudi Arabia
ConstructChat
Ask ConstructChat about إنشاء التجهيزات الأساسية والطريق رقم 12 بين الطرق 1 و 9
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | معتمد |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The work of this contract includes the engineering, procurement and construction (EPC) for the section of road no.12 which lies between road no. 1 and road no. 9. Total length of road is approximately 7.8 kilometers. The right of way for this road is 80 m, 3 lanes per each direction. The project is located in the industrial area of JCPDI. |
Location
Country | Saudi Arabia |
Source
Source | Ministry of Finance, Saudi Arabia |
URL |
More Details
Record type | Project |
Sector | Road, Manufacturing (Industrial), Government |
Article published date | 2025-12-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
