08/7103 - Ballybeg Newtwopothouse Limerick Rd Mallow
The status, timeline and source of this project. A free account opens every field.
Construction of overground steel storage water tank and pump house
- Status
- Prospective
- Sector
- Steel, Water Supply and Storage
- Location
- Ireland
- Updated
- 19 Nov 2026
- Source
- Ireland
ConstructChat
Ask ConstructChat about 08/7103 - Ballybeg Newtwopothouse Limerick Rd Mallow
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | application finalised |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Construction of overground steel storage water tank and pump house |
Original sector | Construction |
Location
Country | Ireland |
Source
Source | Ireland |
URL |
More Details
Record type | Project |
Sector | Steel, Water Supply and Storage |
Article published date | 2026-11-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in Ireland
- Pfizer’s Biotechnology Campus, Clondalkin, Ireland
- Genzyme Manufacturing Expansion, Waterford
- Elan Pharma Secondary Pharmaceutical Facility
- Pfizer’s Synthesis Facility, Ringaskiddy, Ireland
- Great Island Combined Cycle Gas Turbine Power Plant Wexford
- Galway Wind Park
- Shell Corrib Gas Field
- Cordis Corporation Manufacturing Plant, Cashel, Co Tipperary
