logo

0907 Tunal II Dam in Durango, Dgo.

Sector: Hydro • Location: Durango, Mexico

Source: Mexico Projects Hub

Project
Preinvestment

The integrated project consists of the design, construction, expansion, equipment, installation, operation, maintenance, and exploitation of the Tunal II Dam, a water treatment plant, an aqueduct and complementary works to bring water to the city of Durango, Durango. The dam will supply surface water with the Guadalupe Victoria Dam, and with the Santiago Bayacora Dam, in a near future, through an

Project Information FAQ

Project Information

5 Q
The project “0907 Tunal II Dam in Durango, Dgo.” is an infrastructure initiative in the Hydro sector, located in Durango, Mexico. Taiyo aggregates data on it from Mexico Projects Hub.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

preinvestment

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The integrated project consists of the design, construction, expansion, equipment, installation, operation, maintenance, and exploitation of the Tunal II Dam, a water treatment plant, an aqueduct and complementary works to bring water to the city of Durango, Durango. The dam will supply surface water with the Guadalupe Victoria Dam, and with the Santiago Bayacora Dam, in a near future, through an intake work to the pumping plant that will lead this resource through a pressure line to the water treatment plant for treatment, and from there it will be transported by the gravity line to the twin macro-tanks located in “Cerro de los Remedios”, to begin its distribution to the city's water network. The water network considers the construction of 14 regulation and storage tanks, of which 11 have been built. To the date, 3 macro-tanks are needed to built: Nororiente, Mercado and Contreras. The macro-tank El Conejo is already built, but not in service.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data