0914 Integral Mobility Model of the South Zone of the Metropolitan Area of Guadalajara (Line 4)
Sector: Broadband • Location: Jalisco, Mexico
Source: Mexico Projects Hub
PPP, co-investment modality for up to 38 years: Design, executive project, construction, equipment and operation of system of urban electric train type, to be developed within the general railroad communication track, corresponding to line I, within the concessioned right-of-way, between km I-266+500 and km I-287+667, with an approximate length of 21.16 kilometers. Main characteristics: • Origin:
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | execution |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | PPP, co-investment modality for up to 38 years: Design, executive project, construction, equipment and operation of system of urban electric train type, to be developed within the general railroad communication track, corresponding to line I, within the concessioned right-of-way, between km I-266+500 and km I-287+667, with an approximate length of 21.16 kilometers. Main characteristics: • Origin: Las Juntas in the limits of Guadalajara and San Pedro Tlaquepaque; • Destination: Tlajomulco de Zúñiga; • Line operator: SITEUR (Urban Electric Train System); • Layout: - Passenger track: double and new. Tracks should be parallel to the freight track and deployed within the existing right-of-way. 115 lb/yd rail, 1% maximum grade and minimum in-line curvature radius of 286.48 m (1,000 ft). - Freight track: single, existing track. - Type of track: gauge compatible with regulation with regulatory law of rail service. • Stations: 8 • Power supply: - CFE electrical capacity: 60 Megavolt amperes Mva; - Traction substations: 6 and 7 of 2.15-2.5 Mw (depending on whether the catenary supplies 750 or 1500 Vdc); - Estimated demand for CFE: 6 Mw; • Control center: In the yard and workshops of line 4, which will be located in the municipal capital of the municipality of Tlajomulco de Zúñiga. • Collection: integration with the Mi Transporte collection system. • Signaling: fiber optic network, redundancy with radio communication, direct telephony (Pbx), passenger information system, signaling and digital train control systems, MDF (main site), access network (horizontal cabling), IDF's in stations, video surveillance system (CCTV), paging system in stations. Completion in two periods and three stages. FIRST AMENDING AGREEMENT (Nov. 18, 2022). SECOND AMENDMENT AGREEMENT (Sep. 01, 2023). THIRD AMENDING AGREEMENT (Oct. 04, 2023). FOURTH AMENDING AGREEMENT (Aug. 03, 2023). FIFTH AMENDMENT AGREEMENT (Oct. 02, 2023). SIXTH AMENDING AGREEMENT (Nov. 15, 2023). (*) Project with Banobras and/or National Infrastructure Fund (Fonadin) involvement or support. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
