logo

0916 Lakach Exploration and Extraction Integral Services Contract

Sector: Water Supply and Storage • Location: Deep waters of the Gulf of Mexico, Mexico

Source: Mexico Projects Hub

Project
Execution

The contract is in the process of early termination, by agreement of both parties. The objective of the project is to maximize the economic value of the hydrocarbon reserves for the Lakach Field, located in the Lakach contractual area, and contemplates recovering a volume of gas of 847.90 MMMpc, which represents a recovery factor of 64.67% of the 2P reserve of the field, as well as recovering a vo

Project Information FAQ

Project Information

5 Q
The project “0916 Lakach Exploration and Extraction Integral Services Contract” is an infrastructure initiative in the Water Supply and Storage sector, located in Deep waters of the Gulf of Mexico, Mexico. Taiyo aggregates data on it from Mexico Projects Hub.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

execution

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The contract is in the process of early termination, by agreement of both parties. The objective of the project is to maximize the economic value of the hydrocarbon reserves for the Lakach Field, located in the Lakach contractual area, and contemplates recovering a volume of gas of 847.90 MMMpc, which represents a recovery factor of 64.67% of the 2P reserve of the field, as well as recovering a volume of condensate by transporting and processing the produced gas equivalent to 3.58 MMb. It should be noted that the Lakach Field does not present a possible reserve. For the exploitation of the field, the following activities are considered: • Recovery and completion of the 6 development wells already drilled and currently temporarily plugged, as well as the recovery and major repair of the Lakach 2DL appraisal well, which is also plugged. • Construction, installation and interconnection of underwater equipment, through 7 horizontal underwater trees, linked to two production collection centers or manifolds and their control distribution centers. • Laying of marine pipelines: 1 Gas Pipeline of 18” diameter for 56.6 km from the submarine system to the Offshore Gas Processing Platform, 1 Gas Pipeline of 18” diameter for 16.77 km from the Offshore Gas Processing Platform to the point of sale in land, including its fiscal measurement, 1 pipeline of 4” in diameter by 14.37 km in length for the transport of condensates from the Offshore Gas Processing Platform to the point of sale on land and 1 Umbilical, in two sections, the main and the field one with a total length of 56.60 km. The laying of the pipelines towards the terrestrial part includes their beach arrival. • Construction or enabling and installation of a Marine Gas Processing Platform for gas collection and conditioning, including compression. • Activities for the abandonment of wells and facilities.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data