logo

0942 Durango Potabilization Plant

Sector: Chemical (Industrial) • Location: Durango, Mexico

Source: Mexico Projects Hub

Project
Closed

The project consists of the potabilization of surface water from the Guadalupe Victoria dam to replace the current underground sources that supply the city of Durango. The following are considered: - Intake structure on the Guadalupe Victoria dam curtain to take advantage of 27 Mm3/year that will carry water to the pumping plant. - Pumping plant with a capacity of 2,750 l/s, with 6 horizontal cent

Project Information FAQ

Project Information

5 Q
The project “0942 Durango Potabilization Plant” is an infrastructure initiative in the Chemical (Industrial) sector, located in Durango, Mexico. Taiyo aggregates data on it from Mexico Projects Hub.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of the potabilization of surface water from the Guadalupe Victoria dam to replace the current underground sources that supply the city of Durango. The following are considered: - Intake structure on the Guadalupe Victoria dam curtain to take advantage of 27 Mm3/year that will carry water to the pumping plant. - Pumping plant with a capacity of 2,750 l/s, with 6 horizontal centrifugal pumps to send the water through a pressure aqueduct to the potabilization plant. - Potabilization plant, first stage, which includes: construction of two treatment modules with a capacity of 550 l/s each, construction of auxiliary buildings (dosing, substation, operation and control, chlorination station, centrifugal equipment and polymer station, etc.). After treatment, the water will be carried through the aqueduct. - Aqueducts: two pipelines, one pressurized 10.4 km long from the pumping plant to the potabilization plant and a 0.8 km gravity aqueduct from the potabilization plant to join an existing 7.6 km pipeline that reaches the "Los Remedios" storage tank.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data