0942 Durango Potabilization Plant
Sector: Chemical (Industrial) • Location: Durango, Mexico
Source: Mexico Projects Hub
The project consists of the potabilization of surface water from the Guadalupe Victoria dam to replace the current underground sources that supply the city of Durango. The following are considered: - Intake structure on the Guadalupe Victoria dam curtain to take advantage of 27 Mm3/year that will carry water to the pumping plant. - Pumping plant with a capacity of 2,750 l/s, with 6 horizontal cent
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project consists of the potabilization of surface water from the Guadalupe Victoria dam to replace the current underground sources that supply the city of Durango. The following are considered: - Intake structure on the Guadalupe Victoria dam curtain to take advantage of 27 Mm3/year that will carry water to the pumping plant. - Pumping plant with a capacity of 2,750 l/s, with 6 horizontal centrifugal pumps to send the water through a pressure aqueduct to the potabilization plant. - Potabilization plant, first stage, which includes: construction of two treatment modules with a capacity of 550 l/s each, construction of auxiliary buildings (dosing, substation, operation and control, chlorination station, centrifugal equipment and polymer station, etc.). After treatment, the water will be carried through the aqueduct. - Aqueducts: two pipelines, one pressurized 10.4 km long from the pumping plant to the potabilization plant and a 0.8 km gravity aqueduct from the potabilization plant to join an existing 7.6 km pipeline that reaches the "Los Remedios" storage tank. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
