logo

1 GWh Battery Energy Storage System at Barauni Thermal Power Station

Awarded · Bihar · Last reported May 2026

Source: Construction Week Online India

Project
Awarded

SPML Infra Limited has secured a ₹1,128 crore contract from NTPC to develop a 1 GWh Battery Energy Storage System (BESS) at NTPC's Barauni Thermal Power Station in Bihar. The project includes design, engineering, supply, civil works, erection, and commissioning of a 250 MW/1,000 MWh BESS with various components such as 5 MWh DC containers, Battery Management System, Thermal Management System, 33 k

Status
Closed
Sector
Geothermal, Energy Storage, Power Generation (CCGT)
Location
Barauni, Bihar, India
Updated
22 Jul 2026
Source
Construction Week Online India

ConstructChat

Ask ConstructChat about 1 GWh Battery Energy Storage System at Barauni Thermal Power Station

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “1 GWh Battery Energy Storage System at Barauni Thermal Power Station” is an infrastructure initiative in the Geothermal sector, located in Barauni, Bihar, India. Taiyo aggregates data on it from Construction Week Online India.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

SPML Infra Limited has secured a ₹1,128 crore contract from NTPC to develop a 1 GWh Battery Energy Storage System (BESS) at NTPC's Barauni Thermal Power Station in Bihar. The project includes design, engineering, supply, civil works, erection, and commissioning of a 250 MW/1,000 MWh BESS with various components such as 5 MWh DC containers, Battery Management System, Thermal Management System, 33 kV panel boards, 220 kV DC and AC cables, a 220 kV switchyard, and associated accessories. The project will be executed over 18 months, followed by 15 years of operation and maintenance. It aims to integrate large-scale battery storage with existing thermal power infrastructure to enable peak load management, grid stability, and integration of renewable power.

Original sector

Energy

Budget

Location

Country

India

State

Bihar

City

Barauni

Source

Source

Construction Week Online India

URL

More Details

Record type

Project

Sector

Geothermal, Energy Storage, Power Generation (CCGT)

Article published date

2026-05-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project