1 GWh BESS Project at Barauni Thermal Power Station
Awarded · Bihar · Last reported May 2026
Source: Saur Energy
Installation of a 1 GWh Battery Energy Storage System (BESS) at NTPC Limited's Barauni Thermal Power Station in Bihar, including supply, civil works, erection of a 250 MW/1,000 MWh BESS with 5 MWh DC containers, Battery Management System, Thermal Management System, 33 kV panel boards, 220 kV DC and AC cables, and a 220 kV switchyard. The project includes 18 months of execution and 15 years of oper
- Status
- Closed
- Sector
- Geothermal, Energy Storage, Power Generation (CCGT), Solar
- Location
- Bihar, India
- Updated
- 22 Jul 2026
- Source
- Saur Energy
ConstructChat
Ask ConstructChat about 1 GWh BESS Project at Barauni Thermal Power Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of a 1 GWh Battery Energy Storage System (BESS) at NTPC Limited's Barauni Thermal Power Station in Bihar, including supply, civil works, erection of a 250 MW/1,000 MWh BESS with 5 MWh DC containers, Battery Management System, Thermal Management System, 33 kV panel boards, 220 kV DC and AC cables, and a 220 kV switchyard. The project includes 18 months of execution and 15 years of operation and maintenance. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Bihar |
Source
Source | Saur Energy |
URL |
More Details
Record type | Project |
Sector | Geothermal, Energy Storage, Power Generation (CCGT), Solar |
Article published date | 2026-05-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
