100 MW SOLAR POWER PROJECT UNDER CPSU SCHEME

One of 9,281 projects Taiyo tracks in Andhra Pradesh.

Source: India Investment Grid (IIG)

Information NHPC Limited has come up with 100 MW SOLAR POWER PROJECT UNDER CPSU SCHEME with a ticket size of 536.56 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project 100 MW Solar Power Project is being set up under CPSU Scheme, Phas

Status
Closed
Sector
Biomass, Power Generation (CCGT), Road, Wind, Solar, Government, Hydro, Manufacturing (Industrial)
Location
NP Kunta, Andhra Pradesh, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about 100 MW SOLAR POWER PROJECT UNDER CPSU SCHEME

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “100 MW SOLAR POWER PROJECT UNDER CPSU SCHEME” is an infrastructure initiative in the Biomass sector, located in NP Kunta, Andhra Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Company

Status

Original status

notice to proceed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information NHPC Limited has come up with 100 MW SOLAR POWER PROJECT UNDER CPSU SCHEME with a ticket size of 536.56 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project 100 MW Solar Power Project is being set up under CPSU Scheme, Phase-II, Tranche-III against the total allocated capacity of 1000 MW to NHPC Limited by IREDA. NHPC is implementing the development of this project through EPC Contract for 100 MW Grid Connected Solar PV Project and transmission line for power evacuation to ISTS sub-station along with comprehensive O&M for 05 years. The power generated from the project shall be evacuated through Bikaner-II ISTS Substation for use by Government / Government entities through Distribution Companies [DISCOMS]. Only domestically manufactured Cells & Modules shall be used for setting up of Solar Plant as per the provision of CPSU Scheme.

Original sector

Electricity Generation

Procurement method

Budget

Location

Country

India

State

Andhra Pradesh

City

NP Kunta

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Biomass, Power Generation (CCGT), Road, Wind, Solar, Government, Hydro, Manufacturing (Industrial)

Article published date

2025-06-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project