100 MW Solar Power Project with 22 MWh BESS in Chhatrapati Sambhaji Nagar, Maharashtra
One of 10,000+ projects Taiyo tracks in Maharashtra.
Source: Scanx
As part of GAIL's comprehensive renewable energy initiative, an additional 100 MW solar power project integrated with a 22 MWh Battery Energy Storage System (BESS) is planned in Chhatrapati Sambhaji Nagar district, Maharashtra. This project will serve the captive energy requirements of GAIL's PDH-PP Plant at Usar in Raigad district.
- Status
- Prospective
- Sector
- Solar, Power Generation (CCGT), Energy Storage
- Location
- Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- Scanx
ConstructChat
Ask ConstructChat about 100 MW Solar Power Project with 22 MWh BESS in Chhatrapati Sambhaji Nagar, Maharashtra
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | As part of GAIL's comprehensive renewable energy initiative, an additional 100 MW solar power project integrated with a 22 MWh Battery Energy Storage System (BESS) is planned in Chhatrapati Sambhaji Nagar district, Maharashtra. This project will serve the captive energy requirements of GAIL's PDH-PP Plant at Usar in Raigad district. |
Original sector | Energy |
Location
Country | India |
State | Maharashtra |
Source
Source | Scanx |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Energy Storage |
Article published date | 2026-04-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
