100 MW Solar Project with 22 MWh Battery Storage in Chhatrapati Sambhaji Nagar
Sector: Energy Storage • Location: Chhatrapati Sambhaji Nagar, Maharashtra, India
Source: Indian Masterminds
Setup of a 100 MW solar power project with a 22 MWh Battery Energy Storage System (BESS) in Chhatrapati Sambhaji Nagar district (formerly Aurangabad), Maharashtra. This project will support the captive energy needs of GAIL's PDH-PP plant located in Usar, Raigad district, strengthening the company's integrated energy infrastructure.
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT), Solar
- Location
- Chhatrapati Sambhaji Nagar, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- Indian Masterminds
ConstructChat
Ask ConstructChat about 100 MW Solar Project with 22 MWh Battery Storage in Chhatrapati Sambhaji Nagar
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Setup of a 100 MW solar power project with a 22 MWh Battery Energy Storage System (BESS) in Chhatrapati Sambhaji Nagar district (formerly Aurangabad), Maharashtra. This project will support the captive energy needs of GAIL's PDH-PP plant located in Usar, Raigad district, strengthening the company's integrated energy infrastructure. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Maharashtra |
City | Chhatrapati Sambhaji Nagar |
Source
Source | Indian Masterminds |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Solar |
Article published date | 2026-04-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
