logo
ProjectPlanned

100MW Electrolyzer System for BP's Lingen Project

Sector: Power Generation (CCGT) • Location: Lingen, Lower Saxony, Germany

Source: Fuel Cells Works

Accelera will supply a 100MW PEM electrolyzer system for BP's Lingen green hydrogen project in Germany. This project aims to produce up to 11,000 tons of green hydrogen per year, utilizing renewable electricity from offshore wind.

Status
Prospective
Sector
Power Generation (CCGT), Hydrogen, Wind
Location
Lingen, Lower Saxony, Germany
Updated
22 Jul 2026
Source
Fuel Cells Works

ConstructChat

Ask ConstructChat about 100MW Electrolyzer System for BP's Lingen Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “100MW Electrolyzer System for BP's Lingen Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Lingen, Lower Saxony, Germany. Taiyo aggregates data on it from Fuel Cells Works.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Accelera will supply a 100MW PEM electrolyzer system for BP's Lingen green hydrogen project in Germany. This project aims to produce up to 11,000 tons of green hydrogen per year, utilizing renewable electricity from offshore wind.

Original sector

Energy

Location

Country

Germany

State

Lower Saxony

City

Lingen

Source

Source

Fuel Cells Works

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydrogen, Wind

Article published date

2025-02-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project