101075785 - FULTON ST
Active · Illinois
Source: Chicago Data Portal
SPR 2019 CBRC: INSTALLATION OF NEW 23.92 KW SOLAR PV SYSTEM AND ASSOCIATED ELECTRICAL WORK ON ROOF OF EXISTING 1-STORY BUILDING, AS PER PLANS (OCCUPANCY GROUP: F-1; TYPE IIIB CONSTRUCTION)
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Solar, Commercial, Road
- Location
- Chicago, Illinois, United States of America
- Updated
- 19 Nov 2026
- Source
- Chicago Data Portal
ConstructChat
Ask ConstructChat about 101075785 - FULTON ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | SPR 2019 CBRC: INSTALLATION OF NEW 23.92 KW SOLAR PV SYSTEM AND ASSOCIATED ELECTRICAL WORK ON ROOF OF EXISTING 1-STORY BUILDING, AS PER PLANS (OCCUPANCY GROUP: F-1; TYPE IIIB CONSTRUCTION) |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | Chicago Data Portal |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Solar, Commercial, Road |
Article published date | 2026-06-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
