101082226 - WRIGHTWOOD AVE
Active · Illinois
Source: Chicago Data Portal
SPR 2019 CBC. FIRE DAMAGE REPAIRS AT EXISTING ONE AND HALF STORY MASONRY SFR W/ BASEMENT (OCCUPANCY R-5, CONSTRUCTION TYPE IIIA) INCLUDING ELECTRICAL AND PLUMBING. NO HVAC WORK. WORK ONLY ON SECOND FLOOR. NO CHANGE TO EXISTING FLOOR LAYOUT. NO WORK WILL BE DONE IN THE BASEMENT AND FIRST FLOOR. ALL WORK AS PER PLANS.
- Status
- Prospective
- Sector
- Cement, Commercial
- Location
- Chicago, Illinois, United States of America
- Updated
- 19 Nov 2026
- Source
- Chicago Data Portal
ConstructChat
Ask ConstructChat about 101082226 - WRIGHTWOOD AVE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | SPR 2019 CBC. FIRE DAMAGE REPAIRS AT EXISTING ONE AND HALF STORY MASONRY SFR W/ BASEMENT (OCCUPANCY R-5, CONSTRUCTION TYPE IIIA) INCLUDING ELECTRICAL AND PLUMBING. NO HVAC WORK. WORK ONLY ON SECOND FLOOR. NO CHANGE TO EXISTING FLOOR LAYOUT. NO WORK WILL BE DONE IN THE BASEMENT AND FIRST FLOOR. ALL WORK AS PER PLANS. |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | Chicago Data Portal |
URL |
More Details
Record type | Project |
Sector | Cement, Commercial |
Article published date | 2026-06-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
