101082974 - FULTON BLVD
Active · Illinois
Source: Chicago Data Portal
SC 2019 CBRC: INTERIOR ALTERATIONS AND REPLACEMENT OF EXISTING EXTERIOR SIDE WOOD PORCH WITH A NEW METAL PORCH AND STAIRS FOR AN EXISTING 2 STORY 4 DWELLING UNIT MASONRY RESIDENTIAL BUILDING. DUPLEX REAR FIRST FLOOR UNIT AT BASEMENT. (OCCUPANCY GROUP R-2; CONSTRUCTION TYPE IIIA).
- Status
- Prospective
- Sector
- Metal, Cement, Commercial, Residential
- Location
- Chicago, Illinois, United States of America
- Updated
- 19 Nov 2026
- Source
- Chicago Data Portal
ConstructChat
Ask ConstructChat about 101082974 - FULTON BLVD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | SC 2019 CBRC: INTERIOR ALTERATIONS AND REPLACEMENT OF EXISTING EXTERIOR SIDE WOOD PORCH WITH A NEW METAL PORCH AND STAIRS FOR AN EXISTING 2 STORY 4 DWELLING UNIT MASONRY RESIDENTIAL BUILDING. DUPLEX REAR FIRST FLOOR UNIT AT BASEMENT. (OCCUPANCY GROUP R-2; CONSTRUCTION TYPE IIIA). |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | Chicago Data Portal |
URL |
More Details
Record type | Project |
Sector | Metal, Cement, Commercial, Residential |
Article published date | 2026-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
