102 MW Middle Bhotekoshi Hydropower Project
Sector: Power Generation (CCGT) • Location: Sindhupalchok, Nepal
Source: myRepublica
The 102-megawatt Middle Bhotekoshi Hydropower Project, constructed in Sindhupalchok, is now ready for commercial power generation and will soon be connected to Nepal’s national transmission grid. The electricity generated will be transmitted through the New Khimti 400 kV substation and connected to the national grid via the Dhalkebar transmission line.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Hydro, Commercial
- Location
- Sindhupalchok, Nepal
- Updated
- 22 Jul 2026
- Source
- myRepublica
ConstructChat
Ask ConstructChat about 102 MW Middle Bhotekoshi Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | ready for commercial operation |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 102-megawatt Middle Bhotekoshi Hydropower Project, constructed in Sindhupalchok, is now ready for commercial power generation and will soon be connected to Nepal’s national transmission grid. The electricity generated will be transmitted through the New Khimti 400 kV substation and connected to the national grid via the Dhalkebar transmission line. |
Original sector | Energy |
Location
Country | Nepal |
City | Sindhupalchok |
Source
Source | myRepublica |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro, Commercial |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
