104MW Ostrea Solar Project
Sector: Power Transmission • Location: Washington, USA
Source: Construction Review
The Ostrea Solar project, developed by Cypress Creek Renewables, is a 104-megawatt direct current (MWdc) utility-scale solar installation underway in Yakima County, Washington. The facility spans 500 acres and will supply clean electricity to between 15,000 and 16,000 homes annually, providing 80MW alternating current (MWac) to the grid via a new 115 kV substation.
- Status
- Under Construction
- Sector
- Power Transmission, Power Generation (CCGT), Solar
- Location
- Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Construction Review
ConstructChat
Ask ConstructChat about 104MW Ostrea Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Ostrea Solar project, developed by Cypress Creek Renewables, is a 104-megawatt direct current (MWdc) utility-scale solar installation underway in Yakima County, Washington. The facility spans 500 acres and will supply clean electricity to between 15,000 and 16,000 homes annually, providing 80MW alternating current (MWac) to the grid via a new 115 kV substation. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
Source
Source | Construction Review |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Solar |
Article published date | 2025-05-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in USA
- Widen Turnpike SR 91 from Golden Glades Toll Plaza to the Broward County
- Fourth Avenue Corridor Utility Replacement - MEP Bidders
- Utility Work on I-75
- East Hampton Circle Reconstruction
- Stonehill Drive Utility Work
- Utility Repair on 3rd Street North
- Tennessee utility TVA seeks developer for 100-MW battery
- AML3D ARCEMY X Additive Manufacturing Machine for Tennessee Valley Authority
