logo

105 MWp Solar Plant in Mahoba

Sector: Power Generation (CCGT) • Location: Mahoba, Uttar Pradesh, India

Source: Business Standard

Project
Completed

Sunsure Energy commissioned a 105 MWp solar power project located in Kabrai village, Mahoba District, Uttar Pradesh. The project is connected to the grid through a dedicated 7-km, 132 kV transmission line and is the first solar project to evacuate green power under Uttar Pradesh's Green Energy Corridor-II (GEC-II) project. It generates over 16.7 crore units of clean power annually, enough to meet

Status
Closed
Sector
Power Generation (CCGT), Solar
Location
Mahoba, Uttar Pradesh, India
Updated
22 Jul 2026
Source
Business Standard

ConstructChat

Ask ConstructChat about 105 MWp Solar Plant in Mahoba

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “105 MWp Solar Plant in Mahoba” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Mahoba, Uttar Pradesh, India. Taiyo aggregates data on it from Business Standard.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Sunsure Energy commissioned a 105 MWp solar power project located in Kabrai village, Mahoba District, Uttar Pradesh. The project is connected to the grid through a dedicated 7-km, 132 kV transmission line and is the first solar project to evacuate green power under Uttar Pradesh's Green Energy Corridor-II (GEC-II) project. It generates over 16.7 crore units of clean power annually, enough to meet the electricity needs of nearly 1.4 lakh households and offset approximately 1.2 lakh tonnes of CO₂ emissions annually.

Original sector

Energy

Budget

Location

Country

India

State

Uttar Pradesh

City

Mahoba

Source

Source

Business Standard

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar

Article published date

2026-06-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project