105 MWp Solar Plant in Mahoba
Sector: Power Generation (CCGT) • Location: Mahoba, Uttar Pradesh, India
Source: Lokmat Times
Sunsure Energy commissioned a 105 MWp solar power project in Kabrai village, Mahoba District, Uttar Pradesh. The project spans 282 acres and is connected to the grid via a dedicated 7-km, 132 kV transmission line. It generates over 16.7 crore units of clean power annually, sufficient to meet the electricity needs of approximately 1.4 lakh households, and offsets about 1.2 lakh tonnes of CO₂ emissi
- Status
- Closed
- Sector
- Power Generation (CCGT), Solar
- Location
- Mahoba, Uttar Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Lokmat Times
ConstructChat
Ask ConstructChat about 105 MWp Solar Plant in Mahoba
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sunsure Energy commissioned a 105 MWp solar power project in Kabrai village, Mahoba District, Uttar Pradesh. The project spans 282 acres and is connected to the grid via a dedicated 7-km, 132 kV transmission line. It generates over 16.7 crore units of clean power annually, sufficient to meet the electricity needs of approximately 1.4 lakh households, and offsets about 1.2 lakh tonnes of CO₂ emissions annually. This project is the first to evacuate green power under Uttar Pradesh's Green Energy Corridor-II initiative. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Uttar Pradesh |
City | Mahoba |
Source
Source | Lokmat Times |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar |
Article published date | 2026-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
