1050 East Road Over High Line Canal (25586-39)
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project is to remove the 35 ft long by 20 ft wide existing bridge on 1050 East Road and replace the bridge with a new 65 ft long by 36 ft wide premanufactured steel bridge. The 1050 East Bridge is located approximately 2000 ft south of E3300 N Road and 12.9 miles from the City of Buhl. The bridge will remain closed during construction. Additional work includes but is not limited to channel st
- Status
- Prospective
- Sector
- Steel, Bridge, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Metal, Manufacturing (Industrial), Commercial
- Location
- Wichita Falls, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 1050 East Road Over High Line Canal (25586-39)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is to remove the 35 ft long by 20 ft wide existing bridge on 1050 East Road and replace the bridge with a new 65 ft long by 36 ft wide premanufactured steel bridge. The 1050 East Bridge is located approximately 2000 ft south of E3300 N Road and 12.9 miles from the City of Buhl. The bridge will remain closed during construction. Additional work includes but is not limited to channel stabilization with riprap and roadway construction. The project is subject to environmental permitt... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Wichita Falls |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Bridge, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Metal, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
