10th Line Bridge Replacement
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Dodge USA
Scope - The Project includes Materials, Labors and Equipment for Credit Valley Conservation (CVC) Construction Services for the Replacement of the 10th Line Bridge at Terra Cotta Conservation Area. The existing wood framed bridge has outlived it's usefulness and requires replacement. The new structure will have an increased span and will meet CVC's current crossing guidelines. There are not to be
- Status
- Closed
- Sector
- Bridge, Government, Road, Commercial
- Location
- Halton Hills, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 10th Line Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Project includes Materials, Labors and Equipment for Credit Valley Conservation (CVC) Construction Services for the Replacement of the 10th Line Bridge at Terra Cotta Conservation Area. The existing wood framed bridge has outlived it's usefulness and requires replacement. The new structure will have an increased span and will meet CVC's current crossing guidelines. There are not to be any in-channel works for this project. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Halton Hills |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Government, Road, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in Canada
- Aqsarniit Hotel and Convention Centre
- Toronto Airport Piers D and E Fixed Bridges
- British Columbia Swartz Bay and Tsawwassen Ferry Terminals
- Viva Magnetics Plant
- Sheffield Bridge Tri-Municipal Project
- Nisichawayasihk Cree Nation (NCN) Road Paving Project Phase 2
- Rosenort Industrial Park Road Extension
- Paving of Oak River Roads
