110 North Wacker
Sector: Bridge • Location: Chicago, Illinois, United States of America
Source: Clark Construction
Constructed on one of the last available pieces of riverside real estate in downtown Chicago, 110 North Wacker is the tallest office tower built in Chicago since 1990. The 56-story building’s design maximizes Class A leasable space and corner office opportunities and showcases bright and airy column-free cantilevered interiors. Outside, a public space along the riverfront features a landscaped, co
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Constructed on one of the last available pieces of riverside real estate in downtown Chicago, 110 North Wacker is the tallest office tower built in Chicago since 1990. The 56-story building’s design maximizes Class A leasable space and corner office opportunities and showcases bright and airy column-free cantilevered interiors. Outside, a public space along the riverfront features a landscaped, covered walkway connecting two pedestrian paths and a park. Creative Collaboration Construction of this striking and innovative building was the result of a true collaborative effort between Clark, Riverside Investment & Development, and Goettsch Partners. Although 110 North Wacker occupies one of the best locations in Chicago in terms of accessibility and visibility, the site’s trapezoidal shape presented a challenge. The narrow site plan was incompatible with a conventional floor plate of 45-foot-wide expanses for office space flanking central elevator cores, while the city mandate for a publicly accessible riverfront further complicated scope. The design solution was to create an unusual stepped-center core, allowing for a 45-foot lease span on each side. Lateral wind resistance was achieved through an optimized system of two-story outriggers and edge trusses at the mid-span of the building. The lobby is framed by floor-to-ceiling glass, supported by a tensioned cable system featuring the world’s first building-integrated continuous load pin monitoring system, which is typically found in suspension bridges. During the design phase, the team also incorporated historical elements discovered during a landmark review of the site’s previous structure – the General Growth Properties building – by the Illinois Historic Preservation Agency and the US Army Corps of Engineers. While incorporating the salvaged metal panels created both aesthetic and building performance challenges, the team thoughtfully integrated the elements to seamlessly blend Chicago's past and present. Innovative Steel Construction 110 North Wacker boasts several innovative structural steel conditions, including a lower-level foundation wall, outriggers, a belt truss system, and a sawtooth shape on the west side of the structure. Most notably, the east foundation wall was constructed with an embedded steel truss system, which allowed vertical construction with structural steel to begin approximately six weeks earlier than a conventional design would have allowed. Even with that time savings, a key design challenge occurred when Riverside added two mid-level floors to the structure after Clark had begun steel construction at level five. This change, made without an extension of the schedule, created several conflicts with previously designed and coordinated scopes of work, including MEPFP, curtain wall, elevators, structural steel, and concrete. The team worked with trade partners and suppliers on redesign and procurement within weeks and their herculean effort allowed Riverside to add 70,000 square feet of leasable space without sacrificing the building's design aesthetic or performance. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Bridge projects in United States of America
- Silverado Canyon Road Bridge ( 55C - 0175 ) Replacement
- Modjeska Canyon Road Bridge ( 55C0172 ) Retrofit
- Application of the California Rapid Assessment Method on Strawberry Creek
- Nine Ten Place
- Clinton Keith Extension Project
- Chuckwalla Valley Road Bridge
- Jurupa Grade Separation
- Center St & Stephens Ave Resurfacing
