112 MWp Solar Power Project in Wardha
Completed · Maharashtra · Last reported Jun 2026
Source: The Tribune
A 112 MWp DC / 80 MW AC ground-mounted solar power project commissioned for Hexa Climate Solutions Private Limited in Jam, Wardha district, Maharashtra. The project includes a 132 kV pooling substation and evacuation infrastructure for grid integration, executed as a turnkey EPC contract with a 2-year O&M contract.
- Status
- Closed
- Sector
- Energy
- Location
- Wardha, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- The Tribune
ConstructChat
Ask ConstructChat about 112 MWp Solar Power Project in Wardha
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 112 MWp DC / 80 MW AC ground-mounted solar power project commissioned for Hexa Climate Solutions Private Limited in Jam, Wardha district, Maharashtra. The project includes a 132 kV pooling substation and evacuation infrastructure for grid integration, executed as a turnkey EPC contract with a 2-year O&M contract. |
Original sector | Energy |
Location
Country | India |
State | Maharashtra |
City | Wardha |
Source
Source | The Tribune |
URL |
More Details
Record type | Project |
Article published date | 2026-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
