logo

112th & Main Office Buildings Phase 1

Sector: Commercial • Location: Bellevue, Washington, United States of America

Source: Dodge USA

Project
Planning Schematics

Phase 1 would redevelop the southern portion of the site and include two 14-story office towers with a total of 550,666 square feet of office and 26,865 square feet of retail - Phase 1 includes two fourteen-story office towers on the southern side of the development, 112th Avenue Southeast and Main Street). Each will feature four levels of below-grade parking, as well as outdoor plaza space, an a

Status
Prospective
Sector
Commercial, Car parking, Residential, Road, Automotive, Steel, Manufacturing (Industrial)
Location
Bellevue, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 112th & Main Office Buildings Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “112th & Main Office Buildings Phase 1” is an infrastructure initiative in the Commercial sector, located in Bellevue, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Phase 1 would redevelop the southern portion of the site and include two 14-story office towers with a total of 550,666 square feet of office and 26,865 square feet of retail - Phase 1 includes two fourteen-story office towers on the southern side of the development, 112th Avenue Southeast and Main Street). Each will feature four levels of below-grade parking, as well as outdoor plaza space, an a through block pedestrian connection. The Phase 1 site area is approximately 116,612 square feet, ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Bellevue

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Car parking, Residential, Road, Automotive, Steel, Manufacturing (Industrial)

Article published date

2024-03-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project