115-mile Power Line Transmission Route
Planned · Virginia · Last reported May 2026
Source: WRIC ABC 8News
A proposed $1 billion transmission line project planning to bring more than 100 miles of power lines to Central Virginia. The 115-mile route would stretch through nine counties and affect 11 historic districts and several battlefields. The project is in response to the state's increasing power demand and is pending approval from the Virginia State Corporation Commission.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Power Transmission
- Location
- Richmond, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- WRIC ABC 8News
ConstructChat
Ask ConstructChat about 115-mile Power Line Transmission Route
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A proposed $1 billion transmission line project planning to bring more than 100 miles of power lines to Central Virginia. The 115-mile route would stretch through nine counties and affect 11 historic districts and several battlefields. The project is in response to the state's increasing power demand and is pending approval from the Virginia State Corporation Commission. |
Original sector | Energy & Utilities |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Richmond |
Source
Source | WRIC ABC 8News |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission |
Article published date | 2026-05-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States
- EPC of Turbine and Foundation Structure in the Southwest Sea Wind Power Demonstration Complex
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Tampa Bay Seawater Desalination Plant
- Carlsbad Desalination Project, San Diego, California
- Joint Base Lewis-McChord
- Fort Benning, Georgia
- Naval Base San Diego, California
- Dover Air Force Base
