1165 - 1195 Main Street Sidewalk Replacement REBID
Sector: Power Generation (CCGT) • Location: East Hartford, Connecticut, United States of America
Source: Dodge
Work under this contract includes repair and replacement of sidewalk sections from on the west side of Main Street (Route 5) from Orchard Street to just past the property at 1195 Main Street in the Town of East Hartford. The sidewalk will be replaced partially with a stamped design and stained to match the aesthetics of the sidewalks south of Orchard Street. It also includes other appurtenant work
- Status
- Closed
- Sector
- Power Generation (CCGT), Power Transmission, Road, Commercial, Car parking, Government, Automotive
- Location
- East Hartford, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 1165 - 1195 Main Street Sidewalk Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work under this contract includes repair and replacement of sidewalk sections from on the west side of Main Street (Route 5) from Orchard Street to just past the property at 1195 Main Street in the Town of East Hartford. The sidewalk will be replaced partially with a stamped design and stained to match the aesthetics of the sidewalks south of Orchard Street. It also includes other appurtenant work such as resetting of utility valves and electric boxes along with providing an opening for futur... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | East Hartford |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Road, Commercial, Car parking, Government, Automotive |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
