117th St Advanced Clearing & Grubbing
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The construction, complete in-place, of the following approximate quantities: Clearing 23 Each Misc. Temp Grading 27,409 Sy Grubbing 23 Each Culvert End Controls 3 Each Clearing 9.1 Acres Silt Fence, Type MS 6,052 Lin Ft Grubbing 9.1 Acres Rapid Stabilization Method 3 36 M. The project includes the clearing & grubbing, temporary grading, and installation of erosion control devices along 117th St f
- Status
- Closed
- Sector
- Road, Commercial, Manufacturing (Industrial), Government
- Location
- Inver Grove Heights, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 117th St Advanced Clearing & Grubbing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The construction, complete in-place, of the following approximate quantities: Clearing 23 Each Misc. Temp Grading 27,409 Sy Grubbing 23 Each Culvert End Controls 3 Each Clearing 9.1 Acres Silt Fence, Type MS 6,052 Lin Ft Grubbing 9.1 Acres Rapid Stabilization Method 3 36 M. The project includes the clearing & grubbing, temporary grading, and installation of erosion control devices along 117th St from Courthouse Blvd to county road 71. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Inver Grove Heights |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Manufacturing (Industrial), Government |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
