11800 South Zone C Reservoir
Sector: Water Supply and Storage • Location: South Jordan, Utah, United States of America
Source: Dodge USA
Construction of two 5MG reservoirs located at 7271 West 11800 South, South Jordan, Utah. JVWCD has contracted with Jacobs to perform the reservoir predesign, design, and construction management. Material testing services and special inspections for the construction of two 5-MG drinking water reservoirs and additional improvements to the site. Project include 1) Construction of two 5-MG reservoirs
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- South Jordan, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 11800 South Zone C Reservoir
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding, Request for Proposals |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of two 5MG reservoirs located at 7271 West 11800 South, South Jordan, Utah. JVWCD has contracted with Jacobs to perform the reservoir predesign, design, and construction management. Material testing services and special inspections for the construction of two 5-MG drinking water reservoirs and additional improvements to the site. Project include 1) Construction of two 5-MG reservoirs that are constructed to a Type I, AWWA D110 Wire Wound, Circular, Prestressed Concrete Water Tank... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | South Jordan |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
