11th Basic Plan for Power Supply
Sector: Power Generation (CCGT) • Location: South Korea
Source: 매일경제
The 11th basic plan for power supply aims to address the supply and demand of electricity over the next 15 years. It has faced delays due to political opposition and is crucial for managing the increasing demand for electricity, particularly from AI data centers and renewable energy sources.
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- South Korea
- Updated
- 22 Jul 2026
- Source
- 매일경제
ConstructChat
Ask ConstructChat about 11th Basic Plan for Power Supply
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 11th basic plan for power supply aims to address the supply and demand of electricity over the next 15 years. It has faced delays due to political opposition and is crucial for managing the increasing demand for electricity, particularly from AI data centers and renewable energy sources. |
Original sector | Energy |
Location
Country | South Korea |
Source
Source | 매일경제 |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
