logo
ProjectPre-Design

12 Diameter Transmission Main Replacement & Upgrade

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The current transmission main through the Gulf Islands National Seashore is a 12" diameter concrete main responsible for supply the west water plant for the City. The main was built in the mid 1970s and is in need of replacement. Additionally, upgrading to a 16" main would increase the ability to meet the maximum demands of the utility.

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Cement, Government, Power Transmission, Power Generation (CCGT), Commercial
Location
Gulf Breeze, Florida, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 12 Diameter Transmission Main Replacement & Upgrade

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “12 Diameter Transmission Main Replacement & Upgrade” is an infrastructure initiative in the Water Supply and Storage sector, located in Gulf Breeze, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The current transmission main through the Gulf Islands National Seashore is a 12" diameter concrete main responsible for supply the west water plant for the City. The main was built in the mid 1970s and is in need of replacement. Additionally, upgrading to a 16" main would increase the ability to meet the maximum demands of the utility.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Gulf Breeze

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Cement, Government, Power Transmission, Power Generation (CCGT), Commercial

Article published date

2024-12-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project