logo

1.2 GW CCGT Power Plant

Sector: Wind • Location: Texas, United States

Source: Enerdata

Project
Under Construction

Gemma will start construction on a 1.2 GW gas-fired combined cycle gas turbine (CCGT) power plant in Lee County, Texas. The project will utilize two Siemens Energy SGT6-9000HL gas turbines and is expected to be completed by 2028.

Status
Under Construction
Sector
Wind, Power Generation (CCGT)
Location
Texas, United States of America
Updated
22 Jul 2026
Source
Enerdata

ConstructChat

Ask ConstructChat about 1.2 GW CCGT Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “1.2 GW CCGT Power Plant” is an infrastructure initiative in the Wind sector, located in Texas, United States. Taiyo aggregates data on it from Enerdata.

Participants

Company

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Gemma will start construction on a 1.2 GW gas-fired combined cycle gas turbine (CCGT) power plant in Lee County, Texas. The project will utilize two Siemens Energy SGT6-9000HL gas turbines and is expected to be completed by 2028.

Location

Country

United States of America (USA)

State

Texas

Source

Source

Enerdata

URL

More Details

Record type

Project

Sector

Wind, Power Generation (CCGT)

Article published date

2025-04-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project