1.2 GW Self-Consumption Solar Power Plant Project
Sector: Solar • Location: Turkey
Source: Renewable Energy Magazine
Tosyalı has signed an agreement with GE Vernova and Inogen for a 1.2 GW self-consumption Solar Power Plant project, utilizing locally produced N-Type Topcon panels. The project aims to generate approximately 50% of Tosyalı's energy needs from solar energy, with the first phase of 120 MWp scheduled to become operational in 2025 and completion expected in 2027.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Under Construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Tosyalı has signed an agreement with GE Vernova and Inogen for a 1.2 GW self-consumption Solar Power Plant project, utilizing locally produced N-Type Topcon panels. The project aims to generate approximately 50% of Tosyalı's energy needs from solar energy, with the first phase of 120 MWp scheduled to become operational in 2025 and completion expected in 2027. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
