logo

1.2 MW Captive Solar Plant by Baheti Recycling

Sector: Solar • Location: Gujarat, India

Source: UNITED NEWS OF INDIA

Project
Planned

Baheti Recycling Industries Limited plans to set up a 1.2 MW captive solar plant in Gujarat with an investment of Rs. 3.51 crore. The project aims to reduce energy costs by 60% and significantly cut the company's carbon footprint, aligning with their sustainability and ESG goals.

Status
Prospective
Sector
Solar, Power Generation (CCGT)
Location
Gujarat, India
Updated
22 Jul 2026
Source
UNITED NEWS OF INDIA

ConstructChat

Ask ConstructChat about 1.2 MW Captive Solar Plant by Baheti Recycling

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “1.2 MW Captive Solar Plant by Baheti Recycling” is an infrastructure initiative in the Solar sector, located in Gujarat, India. Taiyo aggregates data on it from UNITED NEWS OF INDIA.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Baheti Recycling Industries Limited plans to set up a 1.2 MW captive solar plant in Gujarat with an investment of Rs. 3.51 crore. The project aims to reduce energy costs by 60% and significantly cut the company's carbon footprint, aligning with their sustainability and ESG goals.

Original sector

Energy

Budget

Location

Country

India

State

Gujarat

Source

Source

UNITED NEWS OF INDIA

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT)

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project