120 Bridge Repairs
Closed · Indiana · Last reported Oct 2024
Source: Dodge USA
The proposed construction will include the installation of additional timber spreader beams to the existing bridge, tightening of existing bolts throughout, installation of new bolts on existing beams, mill and resurface of 30 ft off each end of bridge, installation of Ohio Type III waterproofing membrane, installing a new asphalt overlay on the bridge deck; and all incidental work required, as sp
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Bridge, Road, Forest Products and Packaging, Government
- Location
- New Palestine, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 120 Bridge Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed construction will include the installation of additional timber spreader beams to the existing bridge, tightening of existing bolts throughout, installation of new bolts on existing beams, mill and resurface of 30 ft off each end of bridge, installation of Ohio Type III waterproofing membrane, installing a new asphalt overlay on the bridge deck; and all incidental work required, as specified in the Contract Documents and Plans. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | New Palestine |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Bridge, Road, Forest Products and Packaging, Government |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
