logo

120-MW Solar Farm by ONDE

Sector: Solar • Location: Poland

Source: GreentechLead

Project
Planned

Poland-based renewable EPC contractor ONDE has won a major order to build a 120-MW solar farm for an unnamed Scandinavian investor. The project includes full EPC delivery, grid connection works, and advanced monitoring systems to ensure high efficiency and long-term performance. Construction is set to begin soon, with commissioning expected in 2025.

Status
Prospective
Sector
Solar, Raw Materials, Stadium, Power Generation (CCGT)
Location
Poland
Updated
22 Jul 2026
Source
GreentechLead

ConstructChat

Ask ConstructChat about 120-MW Solar Farm by ONDE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “120-MW Solar Farm by ONDE” is an infrastructure initiative in the Solar sector, located in Poland. Taiyo aggregates data on it from GreentechLead.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Poland-based renewable EPC contractor ONDE has won a major order to build a 120-MW solar farm for an unnamed Scandinavian investor. The project includes full EPC delivery, grid connection works, and advanced monitoring systems to ensure high efficiency and long-term performance. Construction is set to begin soon, with commissioning expected in 2025.

Original sector

Renewable Energy

Location

Country

Poland

Source

Source

GreentechLead

URL

More Details

Record type

Project

Sector

Solar, Raw Materials, Stadium, Power Generation (CCGT)

Article published date

2025-12-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project