logo

120 MW/240 MWh Battery Energy Storage System (BESS) Project

Sector: Energy Storage • Location: Gujarat, India

Source: InvestyWise

Project
Awarded

Sun Drops Energia Limited, a subsidiary of KPI Green Energy Limited, has signed a Battery Energy Storage Purchase Agreement with Gujarat Urja Vikas Nigam Limited (GUVNL) to develop a 120 MW / 240 MWh standalone battery energy storage system. The project will be developed at two locations in Gujarat near the 220kV Gariyadhar AIS Substation and the 220kV Otha AIS Substation, providing 65 MW / 130 MW

Status
Closed
Sector
Energy Storage
Location
Gujarat, India
Updated
22 Jul 2026
Source
InvestyWise

ConstructChat

Ask ConstructChat about 120 MW/240 MWh Battery Energy Storage System (BESS) Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “120 MW/240 MWh Battery Energy Storage System (BESS) Project” is an infrastructure initiative in the Energy Storage sector, located in Gujarat, India. Taiyo aggregates data on it from InvestyWise.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Sun Drops Energia Limited, a subsidiary of KPI Green Energy Limited, has signed a Battery Energy Storage Purchase Agreement with Gujarat Urja Vikas Nigam Limited (GUVNL) to develop a 120 MW / 240 MWh standalone battery energy storage system. The project will be developed at two locations in Gujarat near the 220kV Gariyadhar AIS Substation and the 220kV Otha AIS Substation, providing 65 MW / 130 MWh and 55 MW / 110 MWh capacity respectively. This project is supported by Viability Gap Funding (VGF) and aims to support grid stability for GUVNL on a long-term basis.

Original sector

Energy

Location

Country

India

State

Gujarat

Source

Source

InvestyWise

URL

More Details

Record type

Project

Sector

Energy Storage

Article published date

2026-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project