1207 N Capitol Avenue Daycare Project
Sector: Automotive • Location: San Jose, California, United States of America
Source: Dodge USA
Demolish an existing single-family residence and construct a new 14,379 square foot daycare center. The project will also include the construction of a new driveway, a parking lot with 37 vehicle spaces, landscaping, planting of 50 new trees, removal of an existing septic system, extension of the sanitary sewer and storm drain mains in N. Capitol Avenue, and widening of the frontage sidewalk.
- Status
- Failure
- Sector
- Automotive, Water Supply and Storage, Car parking, Education, Road, Waste Processing and Treatment, Commercial, Government
- Location
- San Jose, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 1207 N Capitol Avenue Daycare Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Abandoned |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demolish an existing single-family residence and construct a new 14,379 square foot daycare center. The project will also include the construction of a new driveway, a parking lot with 37 vehicle spaces, landscaping, planting of 50 new trees, removal of an existing septic system, extension of the sanitary sewer and storm drain mains in N. Capitol Avenue, and widening of the frontage sidewalk. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Jose |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Water Supply and Storage, Car parking, Education, Road, Waste Processing and Treatment, Commercial, Government |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
