logo

1.25 GW Solar Project in Basra

Sector: Power Generation (CCGT) • Location: Iraq

Source: GreentechLead

Project
Planned

The Iraqi Ministry of Oil has signed an agreement with TotalEnergies and QatarEnergy to develop a 1.25 GW solar project in Basra, which will be built in five 250 MW phases between 2025 and 2027, utilizing bifacial solar panels on single-axis trackers.

Status
Prospective
Sector
Power Generation (CCGT), Oil and Gas, Solar, Government
Location
Iraq
Updated
22 Jul 2026
Source
GreentechLead

ConstructChat

Ask ConstructChat about 1.25 GW Solar Project in Basra

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “1.25 GW Solar Project in Basra” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Iraq. Taiyo aggregates data on it from GreentechLead.

Participants

Sponsoring Agency

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Iraqi Ministry of Oil has signed an agreement with TotalEnergies and QatarEnergy to develop a 1.25 GW solar project in Basra, which will be built in five 250 MW phases between 2025 and 2027, utilizing bifacial solar panels on single-axis trackers.

Original sector

Renewable Energy

Location

Country

Iraq

Source

Source

GreentechLead

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Oil and Gas, Solar, Government

Article published date

2025-04-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project