12710 E Sprague Ave Precinct Remodel
Gc bidding · Washington · Last reported Jul 2025
Source: Dodge
Project consists of, but is not limited to, demolition, tenant improvements including HVAC and electrical modifications as needed, and other related work, all in accordance with the Contract Provisions and Plans.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Government, Commercial
- Location
- Spokane Valley, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 12710 E Sprague Ave Precinct Remodel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of, but is not limited to, demolition, tenant improvements including HVAC and electrical modifications as needed, and other related work, all in accordance with the Contract Provisions and Plans. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Spokane Valley |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
