128th & Pioneers - 103rd & Rokeby Rebuild
Sector: Power Transmission • Location: Lincoln, Nebraska, United States of America
Source: Dodge USA
Rebuild 1.4 miles of the existing 115kV Line 5660 between 56th & Everett and 56th & Q substations. The original poles were gas treated and do not have the life expectancy of a typical wood pole. The poles were inspected/tested/treated in late 2012. The existing 115kV line was installed in 1970, will be 55 years old in 2025 and is reaching the end of its useful life.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Rebuild 1.4 miles of the existing 115kV Line 5660 between 56th & Everett and 56th & Q substations. The original poles were gas treated and do not have the life expectancy of a typical wood pole. The poles were inspected/tested/treated in late 2012. The existing 115kV line was installed in 1970, will be 55 years old in 2025 and is reaching the end of its useful life. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
