12th & Olive - 51 Story South Park PHASE 3 Mixed Use Tower
Sector: Consumer Products • Location: Los Angeles, California, United States of America
Source: Dodge USA
491,515 sf nonparking space -51-story mixed-use building containing 536 dwelling units and 4,178 square feet of ground floor commercial space. The Site 2 Development would include a total floor area of 491,515 square feet with a floor area ratio (FAR) of 9.13:1. The building would be a maximum of 603 feet in height as measured from grade to the top of the roof structure. The Site 2 Development wou
- Status
- Prospective
- Sector
- Consumer Products, Steel, Car parking, Residential, Automotive, Manufacturing (Industrial), Commercial
- Location
- Los Angeles, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 12th & Olive - 51 Story South Park PHASE 3 Mixed Use Tower
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 491,515 sf nonparking space -51-story mixed-use building containing 536 dwelling units and 4,178 square feet of ground floor commercial space. The Site 2 Development would include a total floor area of 491,515 square feet with a floor area ratio (FAR) of 9.13:1. The building would be a maximum of 603 feet in height as measured from grade to the top of the roof structure. The Site 2 Development would provide 581 automobile parking spaces for residential use in six (6) levels of subterranean pa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Los Angeles |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Steel, Car parking, Residential, Automotive, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- CS 611/SURSSON STREET FROM SR 4 TO OLD BEN CARTER ROAD - TIA
- EAST TOLLISION STREET
- NORMAN BERRY DR/BOBBY BROWN FROM SUMNER PARK TO VIRGINIA AVE
- NEW DETACHED ADU, 840 SQ.FT. AND NEW PORCH, 32 SQ.FT.
- NEW DETACHED ADU 799 SQ. FT. - 3 BED 2 BATH
- BLDG 3, UNIT 4, NEW TOWNHOME WITH GARAGE 1605 SQ FT LIVING, 482 SQ FT GARAGE
- The Kia Forum
- William R. Boone High School
