logo

12th Street Bridge Preservation Project Phase Two

Sector: Bridge • Location: Sioux Falls, South Dakota, United States

Source: 97.3 KKRC

Project
Under Construction

Phase two of the 12th Street Bridge Preservation project involves concrete bridge deck repairs on the inside lanes, application of a two-coat polymer chip seal, replacement of deteriorated strip seal joints at both ends of the bridge, and installation of permanent pavement markings. Traffic on the West 12th Street bridge near Grange Avenue will be reduced to one lane in each direction during this

Status
Under Construction
Sector
Bridge, Cement, Road
Location
Sioux Falls, South Dakota, United States of America
Updated
22 Jul 2026
Source
97.3 KKRC

ConstructChat

Ask ConstructChat about 12th Street Bridge Preservation Project Phase Two

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “12th Street Bridge Preservation Project Phase Two” is an infrastructure initiative in the Bridge sector, located in Sioux Falls, South Dakota, United States. Taiyo aggregates data on it from 97.3 KKRC.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Phase two of the 12th Street Bridge Preservation project involves concrete bridge deck repairs on the inside lanes, application of a two-coat polymer chip seal, replacement of deteriorated strip seal joints at both ends of the bridge, and installation of permanent pavement markings. Traffic on the West 12th Street bridge near Grange Avenue will be reduced to one lane in each direction during this phase, expected to last two to three weeks starting June 1, 2026.

Original sector

Transportation

Location

Country

United States of America (USA)

State

South Dakota

City

Sioux Falls

Source

Source

97.3 KKRC

URL

More Details

Record type

Project

Sector

Bridge, Cement, Road

Article published date

2026-06-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project