logo

130-metre steel bridge span for Mumbai-Ahmedabad Bullet Train project

The owner, status and timeline of this project. A free account opens every field.

Source: ET Infra

Project
Under Construction

A 130-metre steel bridge span was successfully launched over Indian Railway tracks near Tralsi village in the Bharuch district of Gujarat as part of the Mumbai-Ahmedabad Bullet Train project. The bridge crosses the Dedicated Freight Corridor Corporation (DFCC) tracks between the Surat and Vadodara section of the Western Dedicated Freight Corridor. The structure is a three-span bridge consisting of

Status
Under Construction
Sector
Mass Transit, Bridge, Steel, Rail, Manufacturing (Industrial)
Location
Bharuch, Gujarat, India
Updated
22 Jul 2026
Source
ET Infra

ConstructChat

Ask ConstructChat about 130-metre steel bridge span for Mumbai-Ahmedabad Bullet Train project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “130-metre steel bridge span for Mumbai-Ahmedabad Bullet Train project” is an infrastructure initiative in the Mass Transit sector, located in Bharuch, Gujarat, India. Taiyo aggregates data on it from ET Infra.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 130-metre steel bridge span was successfully launched over Indian Railway tracks near Tralsi village in the Bharuch district of Gujarat as part of the Mumbai-Ahmedabad Bullet Train project. The bridge crosses the Dedicated Freight Corridor Corporation (DFCC) tracks between the Surat and Vadodara section of the Western Dedicated Freight Corridor. The structure is a three-span bridge consisting of a 100-metre and 130-metre continuous span, alongside an additional 100-metre simply supported span. The 130-metre section was moved into position on May 16, 2026. The steel bridges were fabricated at the Karbon Factory in Umergaon, Gujarat, and are designed for a 100-year lifespan. The project includes the construction of multiple steel structures, with 14 out of 17 steel bridges planned for the Gujarat portion now complete, and 28 steel bridges planned in total for the entire corridor.

Original sector

Railways

Location

Country

India

State

Gujarat

City

Bharuch

Source

Source

ET Infra

URL

More Details

Record type

Project

Sector

Mass Transit, Bridge, Steel, Rail, Manufacturing (Industrial)

Article published date

2026-05-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project