1300 E Storm Drain Rehab
Sector: Water Supply and Storage • Location: Salt Lake City, Utah, United States of America
Source: Dodge USA
1300 E Storm Drain Rehab - I80 to City Boundary. Cipp Rehabilitation of Storm Drain System Including Approximately 1,361 Feet of 21-Inch Pipe, 1,454 Feet of 30-Inch Pipe, 429 Feet of 50 X32 Arched Pipe, 509 Feet of 56 X36 Arched Pipe, Top Slab Replacement of Six Drianage Structures, and Rehabilitation of 12 Drainage Structures.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Salt Lake City, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 1300 E Storm Drain Rehab
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1300 E Storm Drain Rehab - I80 to City Boundary. Cipp Rehabilitation of Storm Drain System Including Approximately 1,361 Feet of 21-Inch Pipe, 1,454 Feet of 30-Inch Pipe, 429 Feet of 50 X32 Arched Pipe, 509 Feet of 56 X36 Arched Pipe, Top Slab Replacement of Six Drianage Structures, and Rehabilitation of 12 Drainage Structures. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Salt Lake City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
