131st Street Multi-Use Path Trail Project
The owner, status and timeline of this project. A free account opens every field.
Source: Patch
Construction of a 1.84-mile long, 10-foot wide bi-directional multi-use path on 131st Street from Derby Road to Bell Road, including sections along Derby Road from Pine Needles Drive to 131st Street. The project aims to provide pedestrian accommodations where none currently exist and to safely connect residents with the rest of the network.
- Status
- Under Construction
- Sector
- Road, Government
- Location
- Lemont, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Patch
ConstructChat
Ask ConstructChat about 131st Street Multi-Use Path Trail Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a 1.84-mile long, 10-foot wide bi-directional multi-use path on 131st Street from Derby Road to Bell Road, including sections along Derby Road from Pine Needles Drive to 131st Street. The project aims to provide pedestrian accommodations where none currently exist and to safely connect residents with the rest of the network. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Lemont |
Source
Source | Patch |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-05-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
