132 KV Transmission Line in Banke
Sector: Power Generation (CCGT) • Location: Nepal
Source: Khabarhub
The construction of a 132 KV transmission line in Baniyabhar, Banke has resumed under security protection after previous local opposition. The project is crucial for improving electricity distribution in the region.
- Status
- Under Construction
- Sector
- Power Generation (CCGT)
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- Khabarhub
ConstructChat
Ask ConstructChat about 132 KV Transmission Line in Banke
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The construction of a 132 KV transmission line in Baniyabhar, Banke has resumed under security protection after previous local opposition. The project is crucial for improving electricity distribution in the region. |
Original sector | Energy |
Location
Country | Nepal |
Source
Source | Khabarhub |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-05-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
