132kV Transmission Line for ZESCO
Sector: Power Generation (CCGT) • Location: Lusaka, Zambia
Source: News on Projects
Bajel Projects Limited has successfully completed and commissioned the 132kV Single Circuit Coventry–Waterworks, Coventry–Jimmy–Chawama Transmission Line Project for ZESCO in Lusaka, Zambia. The project included the construction of three critical transmission lines aimed at boosting grid reliability and supporting the growing power demand in the region.
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Lusaka, Zambia
- Updated
- 22 Jul 2026
- Source
- News on Projects
ConstructChat
Ask ConstructChat about 132kV Transmission Line for ZESCO
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bajel Projects Limited has successfully completed and commissioned the 132kV Single Circuit Coventry–Waterworks, Coventry–Jimmy–Chawama Transmission Line Project for ZESCO in Lusaka, Zambia. The project included the construction of three critical transmission lines aimed at boosting grid reliability and supporting the growing power demand in the region. |
Original sector | Energy |
Location
Country | Zambia |
City | Lusaka |
Source
Source | News on Projects |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-04-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
